Expro North Sea Ltd - Reading
Designed and supplied in total six different sized heating jackets - 2 x 50mm/300mm 100w 240v, 2 x 85mm/300mm 100w 240v and 2 x 230mm/700mm 400w 240v.
East Peckham WWTW
For our second project at this site, ESH supplied and installed both trace heating and thermal insulation on the de-sludge pipeline which ran from the inlet works to the sludge tank feed chamber.
King's College Hospital - London
The project scope for our second visit was to supply and install a further 130m of VC constant wattage tape to frost protect pipework on the roof area.
Rosser & Russel - Basingstoke
Supplied and installed a temperature maintenance system on the hot water pipework in the ground floor toilets.
East Peckham WWTW
Supplied and installed frost protection trace heating and thermal insulation to the primary settlement tank within the de-sludging pumping station.
Marco's Leisure Ltd - Edinburgh
Supplied and installed 540m VCBOJ constant wattage tape to provide frost protection to the chilled water pipework.
Ironbridge Power Station
For this local project within the picturesque village of Ironbridge, ESH supplied and completed the installation of a temperature maintenance Trace Heating system for a heavy fuel oil supply pipe line. In total 700m of HFO supply pipework need to maintain +55°C.