Tuesday 20 December 2005

Expro North Sea Ltd - Reading
Designed and supplied in total six different sized heating jackets - 2 x 50mm/300mm 100w 240v, 2 x 85mm/300mm 100w 240v and 2 x 230mm/700mm 400w 240v.
East Peckham WWTW
For our second project at this site, ESH supplied and installed both trace heating and thermal insulation on the de-sludge pipeline which ran from the inlet works to the sludge tank feed chamber.

Thursday 15 December 2005

King's College Hospital - London
The project scope for our second visit was to supply and install a further 130m of VC constant wattage tape to frost protect pipework on the roof area.

Wednesday 14 December 2005

Rosser & Russel - Basingstoke
Supplied and installed a temperature maintenance system on the hot water pipework in the ground floor toilets.

Friday 9 December 2005

East Peckham WWTW
Supplied and installed frost protection trace heating and thermal insulation to the primary settlement tank within the de-sludging pumping station.

Wednesday 7 December 2005

Marco's Leisure Ltd - Edinburgh
Supplied and installed 540m VCBOJ constant wattage tape to provide frost protection to the chilled water pipework.

Monday 5 December 2005

Ironbridge Power Station
For this local project within the picturesque village of Ironbridge, ESH supplied and completed the installation of a temperature maintenance Trace Heating system for a heavy fuel oil supply pipe line. In total 700m of HFO supply pipework need to maintain +55°C.